Generac Power Systems | Gaia Battery Backup | ETQ Diesel Power | Industrial Gensets | Diesel Truck Generator APU | |||||||||||||||||||||||||||||||||||||||||
|
Motor, hp | To start |
To run | ||
|---|---|---|---|---|
|
1/6 |
1,000 | 215 |
Now determine how many appliances
you want to run at the same time and add or total the wattage. The size of the
generator you use must be such that it will start and run the necessary appliances.
If you get a generator that is too small to run refrigerators and freezers, they
will try to start, but the voltage will drop and their motors will overheat and
burn out. If you cannot find the wattage, an estimate can be made from the following
table:
|
Essential home equipment |
|
Typical wattage | ||
|---|---|---|---|---|
| Refrigerator |
400-800 | |||
| Optional home equipment | |
Typical wattage | ||
| Electric
skillet |
1,150-1,500 | |||
|
Farm equipment |
|
Typical wattage | ||
| Ventilator
fans | 300-800 | |||
For example, if you want a generator to run a refrigerator and a freezer, the wattage (table 2) of the refrigerator would be 800 and the freezer would be 1,000. To select the correct size generator, you decide if both refrigerator and freezer are to start at the same time. If so, you would need (1,800 X 4) 7,200 watts. You would select the nearest larger wattage generator. If you can be certain both appliances will not start at the same time, you would only need 4,800 watts (to run the refrigerator while starting the freezer).
Install wiring and equipment to meet National Electrical Code requirements, local regulations and the requirements of the power supplier. Single phase standby generators are connected to the electrical line by a double-pole, double throw transfer switch. This prevents accidentally feeding power back into the utility lines where it can injure neighbors or utility workers servicing the lines. This type switch also protects the generator from damage when power is restored.
Put the switch in a water-tight box and properly ground it, the central meter pole is a common location. Install the switch between the watthour meter and the service disconnect (main fuse box). Note that the white (neutral) conductor is usually not switched, but some power suppliers require it be switched also. When the handle is up, the utility black and red conductors are connected to the load black and red conductors, respectively. In the down position, the load conductors are disconnected from the utility conductors and connected to the black and red conductors from the generators.